Created on
Mar 28, 2025
Completed on
Apr 01, 2025
Signed by
Leizel Baes
QA Engineer
After maintenance of the Parkplace site, we got the following results:
This report was signed by
Leizel Baes,
QA Engineer,
on
Tuesday,
April
1
2025 at 02:16 AM.
The following performance and structure tests were conducted using the industry-leading tool, GTMetrix.